Pardon Our Progress - Our Shoreline is Showing

Pardon our Progress Sign

The 2023 Lake Drawdown Schedule was announced at Town Council on 7/12/22 and was widely publicized.  The lake began lowering on 1/1/23 as planned in support of several important infrastructure projects. 

It is anticipated that the lake will begin refilling on 3/31/23. The rate of refilling the lake is dependent upon weather conditions but information will be posted here regarding weekly lake levels.

Lake levels will vary during the drawdown between 5 feet below full pond and 12 feet below full pond, depending on the work requirements of contractors. 

A list of projects to be completed during the lake drawdown is listed below: 

  • Beginning of Phase One of the sewer system replacement project. This will include boring pipe sleeves on properties in the Sunset Cove area.    
  • Lake dredging with excavators
  • Seawall repair/replacement
  • Penstock inspection and warrantee repairs
  • Work on deep water access ramp near the dam

NOTE: Contractors working on seawall repairs/replacement must be out of the lake by 3/15/23.